Description
Aus Vogelschutzgründen **in der Regel vom 1.2. bis 31.7. gesperrt.** Verlängerungen oder Verkürzungen sind möglich. / **Generally closed from 1.2. to 31.7.** due to bird breeding. Extension or reduction possible.
[IG Klettern: Sperrungen](https://ig-klettern-niedersachsen.de/sperrungen-temporaer/)
Access Issues
For bird protection reasons, the cliffs from Grüner Turm to Kullerkopf are closed to climbing from February 1st to July 31st. In the case of late broods, an extension of individual closures until the end of August at the latest cannot be ruled out. Cliffs that have not been incubated are expected to be open towards the end of April, incubated cliffs after the young birds have fledged (usually between the end of June and the end of July). Current information can be found on the website of [IG Klettern Niedersachsen](https://ig-klettern-niedersachsen.de/sperrungen/).
Aus Vogelschutzgründen sind die Felsen von Grüner Turm bis Kullerkopf vom 1. Februar bis zum 31. Juli für den Kletterbetrieb gesperrt. Bei Spätbruten ist eine Verlängerung einzelner Sperrungen bis spätestens Ende August nicht auszuschließen. Nicht bebrütete Felsen werden voraussichtlich gegen Ende April freigegeben, bebrütete nach dem Ausfliegen der Jungvögel (meist zwischen Ende Juni und Ende Juli). Aktuelle Informationen finden Sie auf der Website der [IG Klettern Niedersachsen](https://ig-klettern-niedersachsen.de/sperrungen/).
Approach
**Der Felskopf ist gesperrt. / The top of the cliff is off-limits.**
Ethic
Leave no trace. Leave no draws on routes.